Here are the last progress from this summer and winter:
Sitting before dismantling..
Building a support frame for the body..
Strenghtening the Harbord&Freight jack (longer and thicker arm + soldered support):
Lifting (a one man job!!)
Sandblasting with 3 compressors of 1.5hp connected on a 250l tank, using Sivelco M31 sand: