Joined
·
10,465 Posts
I am planning on getting a bunch of work done to my vette Sunday. It consists of:
New Clutch and Flywheel
Driveshaft U-joints
Driveshaft Loop
Front Spring
Front Lower Ball joints
Hurst Shifter
Lowering kit
Borla Exhaust 2-3/4" Challenge system (off of a ZR1)
It will be a fun Sunday..
ZR1AL, ZR1Pete, Nick, and myself will be doing the work at Al's place
New Clutch and Flywheel
Driveshaft U-joints
Driveshaft Loop
Front Spring
Front Lower Ball joints
Hurst Shifter
Lowering kit
Borla Exhaust 2-3/4" Challenge system (off of a ZR1)
It will be a fun Sunday..
ZR1AL, ZR1Pete, Nick, and myself will be doing the work at Al's place